INSTALLATION MANUAL
Enclosed type conductor rail[LCL] |
Installation Manual |
1. To check the Location of electric supply and then check the Length for bracket installation. 2. To install the Brackets, it should be made with M10 size hole and also mounted horizontal and vertically on the construction in order to install the sliding hanger and fixing clamp. 3. Sliding hanger & Fixing clamp should be installed on bracket by horizontal & vertically 4. The PVC housing should be installed on sliding & fixing clamp. Then the yellow line(for earth) of PVC housing should be connected continouslly, like a line. The screw on connector should be connected for the copper conductor at first and then jointing clamp / fixing clamp should be mounted on PVC housing lately. 5. After a connection of copper conductor and PVC housing, end feed box or center feed box for the electric power connection should be mounted at center or end of PVC housing.and the collector trolley should be installed & connected with moving machine via trolley arm. 6. To finish installation, the end plate should be installed for the electrical safety at the end. If the rubber covering is needed, it can be installed at bottom of PVC housing. 7. To supply electric power, please connect between the feed box and input power cable after the connection of collector trolley with a control pannel of moving machine
|
Checking point |
1. Check vertically and Horizontal mounting for the insulated conductor rail 2. Check installation of the sliding hanger for smooth moving of PVC housing 3. Check the yellow line(for earth) continually 4. Check any obstruction for traveling of collector trolley
|
Inspection |
1. Check the collector trolley for maintenance 2. The life time of Carbon brush is about 5,000km, but it can be short of life time depends on the site condition. |
|